The information on this page relates to the 2000 SOC, for more recent information, see the 2010 SOC System.
Install, inspect, test, maintain, or repair electric gate crossings, signals, signal equipment, track switches, section lines, or intercommunications systems within a railroad system.
Last Modified Date: October 26, 2009